Capital Park is a 6.3 acre multi use development.  The property is bordered by Michigan, Menzies and Superior Streets and is being developed by Concert and Jawl Properties.  The first phase of office space is scheduled to be open in the spring of 2017.  Capital Park has presented some geotechnical challenges as soft to firm grey clay was present at design footing elevation. Foundations consisted of either large spread footings or a reinforced concrete raft slab. In addition, heavier core and seismic loading was supported by reinforced concrete caissons, which were drilled and socketed into bedrock at depth.